Service
Cryogenic Freezer Relocation
Cryogenic and ULT freezer relocation with cold chain continuity — backup power, temperature monitoring and sample transfer planned with your lab team.
Cryogenic and Ultra-Low Freezer Relocation
Moving a minus eighty freezer or a cryogenic vessel is a cold chain problem before it is a lifting problem. The samples, not the cabinet, set the plan.

Continuity Planning
Inventory review with your lab team to agree what travels loaded and what is transferred first.
Backup options confirmed in advance: dry ice, liquid nitrogen dry shippers, or a temporary unit at either end.
Temperature logging through the move so you have a record for each unit.
Shortest practical door-to-door route, with the destination powered and running before departure.
Handling the Units Themselves
Freezers and dewars are moved upright on suitable equipment, secured in the vehicle and given settling time before being restarted where the manufacturer requires it. Access, floor loading and lift capacity are checked at survey, not on the day.
Safety
Cryogenic work carries asphyxiation and cold burn risks. Method statements, ventilation checks and trained handling are standard, and we coordinate with your safety officer on site rules.
FAQs
Frequently asked questions
Why businesses choose us
- Insured & liability coveredGoods in transit and public liability cover on every commercial move, with certificates issued before the job starts.
- Out-of-hours & weekend movesEvening, overnight and weekend schedules so your teams work Friday and log in Monday from the new building.
- Project-managed end to endA named move manager runs the survey, floor plans, crate logistics, labelling and sign-off — one point of contact throughout.
- Capacity for any sizeFrom 10-desk studios to multi-floor HQs, warehouses, labs and data rooms — crews and vehicles scaled to the site.
This service is part of our commercial removals in London programme — see the full range of business relocation services.